Plastic holdfasts
Family :
Lightning conductor
Category :
Flat conductor fixings up to 30 mm wide
The shoulder base should be placed beneath the layer of gravel on the flat roof.
These plastic pyramids are first filled with cement and then positioned
on the flat roof thereby holding down the conductor.
- Supplied empty, with lid.
| Désignation | Réf. | Ø | P(kg) |
| Support pour terrasse gravier, conducteur plat | P6116 | 110 | 0,030 |
| Désignation | Réf. | L x l | P(kg) |
| Plot support ciment vide pour conducteur plat | P6081 | 15x15 | 0,160 |
| Plot support ciment plein pour conducteur plat | P6084 | 15x15 | 1 |